From:                              route@monster.com

Sent:                               Tuesday, December 01, 2015 2:36 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Primavera P6

 

This resume has been forwarded to you at the request of Monster User xapeix01

Donnell Bretherick 

Last updated:  02/25/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Nashville, TN  37208
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: D Bretherick-Resume-.docx

Resume Value: hj8yjh3gppci72up   

  

 

 

Teresa Donnell Bretherick

1222 7th Ave North 615-864-7939 office/home

Nashville, TN 37208                           256-366-7548 Mobile

dbretherick@thes3group.com

 

 

Summary/ Introduction:

Experienced as a Master Project Controls Engineer Manager, Master Planner/Scheduler able to lead a large teams of client in-house planners/schedulers and contractors through work processes for efficient stream line of the management of EPC, Maintenance and Modifications projects. Bachelor of Electrical Engineering degree ,MBA & Project Engineering Phd. Experience with CMMS database operation & integration of SAP, EMPAC, Passport, JD Edwards, Maximo, Empower, PRISM, Microsoft Project, Micro-station, Access, AutoCAD, Project Wise, Timberline, SAP, P2 and Primavera Web base planning databases.. PMP  & CMP certification. Oracle Elite Platinum Partner Primavera EEPM, CPM and Unifier products. ISO-9000 & ISO 16000 integration of power and petroleum plants CMMS for ISO certification including presentation, procedures and personnel training. Set-up and established change request program both planning and financial. Worked with direct-line management and work with field supervision and personnel.

Leaded multi-craft crews in multiple cites in both National & International projects experience in systems related areas of CMMS, procedure writing, planning, estimation, scheduling, budget controls, supervision of  field engineering, installation and commissioning of power industry- (nuclear, cogeneration, combined cycle ,fossil ,hydro,) transmission, DOT, DOD, DOE, DLA, NSA,EMP,commercial and industrial experience. That includes construction, General Contractor, GC, Project Manager, CM, estimator, site procurement/purchaser, development, commercial, heavy, highway, civil, HCSS, heavy bid, estimator, utilities, and third party analysis. Field engineering in disciplines of structural, mechanical, electrical and instrumentation; performing maintenance, capital, modification, green field projects and change request work orders. Excellent verbalization and organization skills, Currently hold a government security clearance.

 

10/01/13 to Present-The S3 Group Inc. Senior Partner/Owner Master Scheduler/Senior Cost Engineer P6-8.3 capital projects, outages and maintenance. Assist on design master templates of work flow for various clients’ consolidation of asset management, cost tracking and earner value management programming.

 

03/04/13 to 10/01/13-NTE Master Scheduler/Senior Consultant for a Turnaround using P6-8.2 with WEB and BI publisher reporting. Assist on design master templates of work flow for various clients’ consolidation of asset management, cost tracking and earner value management programming.

 

02/13/12 to 2/2713- P&B World-State of Tennessee Master Project Controls Engineer establishing Primavera 6.7 Oracle/Citrix/Web interactive scheduling and cost management program for all Capital projects for the State of Tennessee. Transportation, Education, Infrastructure, Parks, Waterways, Energy, and Correction just a few of the listed agencies of the state that are tracked, approved and executed thru the SBC legislative approval.

 

10/03/11-01/3/12 Spencer Reed- Shell Canada Stafford Chemical & Refinery-P-6 training of schedulers in preparation for GSAP conversion of Shell Americas

 

07/11 till 8/11 Bull Run TVA-P-6 Scheduler during the set-up & conversion to P-6 daily maintenance scheduling.

 

02/11 till 5/22/11 Genon-Keystone Power Station-Unit 1 Fossil Outage-Primavera 6.7 & SAP & Seward Power Station Outage

 

08/10 thru 12/03/10  ADM-Decatur IL-Capital Project CO2 Carbon Capture Sequestration DOE Project-Primavera 6.7-Maximo scheduling, planning, cost controls, set-up Primavera 6.7 server data base and built master schedule using EAM for DOE reporting.

 

04/15/10 till 05/22/10 Proenergy-Sidoor CVG Puerto Ordaz, Venezuela GE CTG new construction Primavera 6.7 & Microsoft Project Schedule and performed field Engineering and the Project Manager duties.

 

01/15/10 till 04/02/10 Allegany-Siemens-Harrison Power Station-SAP-Maximo-Primavera 6.7 also Performed field Engineering, Cost Engineering, Project Manager duties and start-up.

 

08/3/09 till 10/30/09-ProEnergy-Siemens-PPL Brunner Island Unit 2 Turbine Outage-Lead Scheduler/Planner using Passport and Primavera 6.2 also Performed field Engineering, Cost Engineering, Project Manager duties and Start-up.

 

6/8/09 till 6/28/09-ProEnergy-Panama City, Panama-Fast Start-up Manager & Commissioning 2 GE H-1000 Diesel CTG simple cycle, Also performed also Performed field Engineering, Cost Engineering, Project Manager duties and Start-up.

 

 

11/17/08 till 3/23/09- Intergen 4 unit Combined Cycle power generation

Field Engineering design, Project Controls and the Project Manager duties, Planner/Scheduler/Cost Engineer-Set-up work flow process between planning/scheduling and cost management, integration of JD Edwards for scheduling and effective cost management.

 

7/08/08 until 11/5/08- Sunoco Toledo Refinery Coker Expansion-Master Scheduler/Planner-Passport-Primavera

 

2/04/08 until 6/27/2008-Dynegy-Plum Point Arkansas-Project Controls Engineer

New Fossil 750 megawatt Arkansas & Texas-Set-up New Citrix Network for Primavera 6.1

 

12/03/07 until 1/27/08-Marathon-Set-up Primavera-6 Citrix Network-Training Personnel and certification in Primavera. Integration of work order and cost programs with primavera.

 

8/20/07 until 11/21/07 -Energy-NRG Big Cajun 2, Fossil

Unit 3 Outage-Master Scheduler P-6 & Cost Engineer using P-6 and MAXIMO. Set-up interfaces and configured Energy project controls and certified employees in the use of databases.

 

4/18/07 until 7/28/07- Chevron El Segundo, CA Refinery Coker Expansion Turn Around. Master Scheduler Primavera Enterprise 6 integration of Passport-SAP integration and tested program during Coker expansion. Line-Dale GE Co-Generation Plant construction master schedule clean-up, set-up of schedule reports for progress and cost GE during transition of main contractor. Monitor schedule during Chevron schedule integration.

 

1/15/07 to 3/12/07-Siemens Orlando office- Master Scheduler Primavera Enterprise 6 and Passport –SAP integration for the Gen Power Longview Coal Power Plant- Fossil Greenfield project, Performed field Engineering, Project Controls and the Project Manager duties.

 

 

8/28/06 to 11/22/06-Chevron Pascagoula Refinery-Master Scheduler P3e-5 Passports-SAP integration and tested program during FCC turnaround expansion.

 

 

11/02 until 5/22/06 Browns Ferry Nuclear Plant TVA

Senior Construction Engineer – Corporate Master Scheduler

Electrical, Instrumentation, Mechanical Work Planner Writer/Scheduler/Procurement

Preliminary analyses of data where guidelines that provided in such areas as system controls, electrical, instrumentation, and mechanical. Scheduling, procurement of materials and planning based own design modification for Facilities & Unit 1 Computer data bases- EMPAC, ICRDS, Passport, Access data bases, Passport, MicoStation, P3.1 & P3e-5.

 

02/02 until 06/26/02 Browns Ferry Nuclear Plant

Construction- Engineer

Worked on mechanical, electrical and civil engineering design for unit one nuclear reactor recovery. Performed detailed mathematical calculations using established formulae; preliminary analyses of data where guidelines provided in such areas as trajectory adequacy quantitative judgments concerning technical data; Analyses and development of documentation/reports of design change notifications.

 

05/99-02/02 XM Satellite Radio Washington, DC

National Project Manager Engineer Director/VP

Project Controls-P3e/c scheduling, contract negotiations and directed national build-out. Build 120 studios with uplink for satellite. Work with Bowen on construction & launch of satellites. 

 

01/99-4/99 (Consultant for XM Satellite Radio)

National Project Manager-Managed two-construction management companies 500 employees. P3 planning and was certified to an instructed others in the use of P3/e

2/94-01/99 C. E. S.  Florence, AL

Owner-President Construction Management services in communication Clients Sprint, Bell South, Cell-one, Power Tel, Omni-Point, Alltel, and GTE. Experience running multi-markets leading cross-functional teams in Network Development. Used Microsoft controls then switched my company to P3. Contract estimation, Site build-outs, Budget analysis and handle negotiations of purchase of equipment and contracts. Contracts with Bell South and SBC for land base T-1 fiber optic repeaters contracts included construction, General Contractor, GC, CM, mall, estimator, site, development, commercial, heavy, highway, civil, project manager, HCSS, heavy bid, estimator, excavation, grading, paving, utilities, pipe, asphalt, and sedimentary controls, DOT, HWY, and DOD.  Review project scopes, designs, and contract.  Issue subcontractor agreements.  Coordinate engineering schedule to meet the production schedule.  Directed project and staff meetings and provide project update over saw the project client, prefers experience using Expedition and P-3 software coordinating and managing multiple mid sizes to large reconstruction jobs.

 

01/87-01/94 Multi-Industrial Projects US Working as a fulltime employee of Westinghouse

Electrical and Instrumentation Engineer performed field Engineering, Project Controls and the Project Manager duties.

Below is a listing of the shut downs, outages and builds.  Uses personal computer in performance of analyses and development of documentation/reports of technical tasks, SAP.  Planner/Scheduler, Site build-outs, Budget analysis and handle negotiations of purchase of equipment and contracts.

 

NUCLEAR/FOSSIL PLANTS

04/87-09/87 Grand Gulf Westinghouse

Field Engineer Mechanical, Instruments and electrical planning

09/87-02/88 FERMI II       Westinghouse

MSR and Turbine outage Field Engineer Flows and Controls

03/88-02/89 Turkey Point/FP&L    Westinghouse

Steam generator replacement-Instrumentation Controls Planner/Field Engineer

03/89-08/89 North Anna-Virginia Power         Westinghouse

North Anna-Virginia Power-Steam generator outage-Generator Coordinator/Field Engineer

09/89-12/90      Sequoyah TVA/ Generator/Turbine & Eddy Current outage

01/82-02/87 BFNP/Power Service /TVA

Browns Ferry Nuclear Plant-Instrumentation-Unit 2 outages and rebuild-Unit 1

& 3 maintenance. ISI walk downs controls and flows. Colbert Fossil and Power Service Instrumentation.

12/90-01/92-Champion Paper Mill- System Start Engineer of the 35 Paper machine.

 

OIL REFINERS/CHEMICAL

01/92-4/94 Exxon Westinghouse

Exxon- Shell- BP- New Orleans-Baton Rouge-Re-built Chemical Additives- Analyzer Tech Supervisor over Mechanical, Civil, Electrical routine maintenance and new unit additions.

Exxon-Baton Rouge-Tank Farm TDC-3000 digital controls-Tech Project director

Exxon-Baton Rouge-Main Refiner TDC-3000 digital controls/Coker Unit

Shalmed-Chemical Plant-Supervisor of controls and motor control center

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Master Scheduler/Planner

The S3 Group Inc.

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Student (High School)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Scheduler/Planner

Desired Status:

Part-Time
Per Diem

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TN-Nashville

Relocate:

No

Willingness to travel:

Up to 100%